Construction Technology Product List and Ranking from 6 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.

Construction Technology Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.

  1. エム・エムブリッジ Hiroshima//Structural Design Office
  2. スペースワークス シーリングシステム Kyoto//Building materials, supplies and fixtures manufacturers
  3. 東海プレカット 大口工場 Aichi//Other construction industries
  4. カワテックス 札幌支店 Hokkaido//Facility Design Office
  5. 中部建材 Aichi//Other construction industries

Construction Technology Product ranking

Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.

  1. Construction technology for large bridges over 200 meters long. エム・エムブリッジ
  2. Construction Technology: "FRP Interior Lining" カワテックス 札幌支店
  3. Rapid three-dimensional construction technology (Suishui MOP method) for converting intersections into grade-separated crossings in a short period of time. エム・エムブリッジ
  4. Sealing hole construction technology スペースワークス シーリングシステム
  5. 4 Sealing stand construction technology スペースワークス シーリングシステム

Construction Technology Product List

1~8 item / All 8 items

Displayed results

Construction Technology: "FRP Interior Lining"

Prevent leaks before they happen! We propose peace of mind and safety through low cost and short delivery times.

We offer a construction technology called "FRP internal lining," which can stop the progression of corrosion in existing underground tanks and prevent leaks before they occur. It is possible to apply this technology to already installed underground storage tanks. For tanks without a manhole, construction to install a manhole will be necessary. 【Features】 ■ Approximately one-third the cost compared to tank replacement ■ Construction for a 10KL tank takes about 5 days, and 12 days for 4 phases ■ Construction can be carried out while maintaining temporary operations ■ Accommodates various capacities from 2KL to 50KL (consultation required for capacities below 2KL) ■ Uses corrosion-resistant material, FRP *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction technology for large bridges over 200 meters long.

Large block erection scaffolding, balancing scaffolding, floating crane scaffolding, cable crane scaffolding, direct hanging scaffolding, barge scaffolding, etc.

We would like to introduce our company's "Long-Span Bridge and Large-Scale Bridge Construction Technology." Starting with the Kanmon Bridge, we have been involved in the construction of long-span bridges such as the Akashi Kaikyō Bridge, the Tatara Bridge, and more recently, the Megami Bridge and the Shinminato Bridge. Our company possesses a wealth of know-how in the construction of long-span bridges. Techniques such as cable crane erection and floating crane erection are employed in special environments, such as straits, estuaries, and steep mountainous areas. With the expertise we have cultivated over many years, we achieve high-precision bridge construction. 【Construction Examples】 ■ Large Block Erection ■ Balancing Erection ■ Direct Hanging Erection ■ Cable Crane Erection ■ Floating Crane Erection *For more details, please refer to the PDF materials or feel free to contact us.

  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rapid three-dimensional construction technology (Suishui MOP method) for converting intersections into grade-separated crossings in a short period of time.

Utilizing modular construction methods and advance construction of bridge pier columns. We will minimize traffic congestion during construction while securing a right-turn lane.

The "Rapid Three-Dimensional Construction Technology (Suisui MOP)" is a technology for converting intersections in urban areas with heavy traffic congestion into grade-separated crossings in a short period of time. In conventional construction methods, traffic congestion can worsen due to the construction work, but this method can minimize traffic congestion during construction. By adopting the "Modular Girder Method" and the simultaneous construction technology for superstructure and substructure using the "Pier Column Pre-Construction Method," significant reductions in construction time are achieved. 【Features】 ■ Adoption of the Modular Girder Method and simultaneous construction technology for superstructure and substructure ■ Significant reduction in construction time ■ Ensures right-turn lanes during construction ■ Reduces traffic congestion associated with construction ■ No need for new assembly land as part of the existing road is utilized as an assembly yard *For more details, please refer to the PDF materials or feel free to contact us.

  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sealing hole construction technology

Electrical work for new construction and renovations can be done easily / Ceiling hole construction technology

■Features of Ceiling Hole Construction Technology 1. Electrical work (ceiling wiring) can be done from inside after the ceiling construction is completed. 2. Wiring and installation of electrical equipment and various sensors for new construction, renovations, and extensions can be easily done from inside. 3. Wiring and installation of electrical equipment and various sensors can be easily done from inside without exposed wiring, preserving the interior design of the building and achieving a neat and aesthetically pleasing finish. 4. Construction time can be reduced (by half), and construction costs can be lowered (by one-third), allowing for safe work and easy electrical construction. 5. Connection verification and inspection can be easily performed from inside, making maintenance tasks easier.

  • Inspection hatches, manhole covers, and ditch covers
  • Interior construction
  • Other commercial buildings and service facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sealing stand construction technology

Fire safety equipment installation for new construction and renovations can be easily done / Sealing stand construction technology

■Features of the Sealing Stand 1. Installation of fire protection equipment, wiring, and mounting of fire detectors can be done collectively after the ceiling work is completed. 2. Wiring in the ceiling and installation of fire detectors for new construction, renovations, and extensions can be easily done from inside the room. 3. Fire tests, confirmation of operation, and verification of installation positions for ceiling detectors can be conducted from inside the room. 4. Wiring and installation of fire protection equipment in the ceiling can be easily done from inside the room without exposed wiring, preserving the interior design of the building and ensuring a neat and tidy finish. 5. Shortened construction time (by half), reduced costs (by one-third), safe work conditions, and easier fire protection equipment installation. 6. Fire tests, confirmation of operation, and verification of installation positions can be conducted from inside the room, making maintenance work safe and easy.

  • Inspection hatches, manhole covers, and ditch covers
  • Interior construction
  • Other commercial buildings and service facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Technology: "Expanded Resin Anchor Method"

Safe and strong! Free ideas can be realized with wooden construction!

The method is a technology for firmly bonding wood together. By drilling holes in the joints of the wood and providing an expansion section in the holes, after inserting bolts, filling with epoxy resin creates resin balls, resulting in a washer effect that enables a strong joint. 【Features】 ■ Allows for large spaces and wide openings using solid timber from cedar and cypress ■ Hardware is not exposed on the surface of the wood, offering excellent design aesthetics ■ Enables strong joints *For more details, please refer to the catalog or feel free to contact us.

  • Other woodworking

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction technology "Polyurea Lining System"

It demonstrates stable strength for a long time outdoors due to its high weather resistance!

The "Polyurea Lining System" is a construction technology that offers high chemical resistance and long-term durability against 50% sulfuric acid, protecting the substrate from various corrosive factors (such as acids and alkalis). With spray application, it is possible to cover several hundred square meters per day. Additionally, the curing time after spraying is just a few seconds to a few minutes, allowing for foot traffic approximately one hour after application, and in some conditions, it can be ready for use in a few hours. 【Features】 ■ Quick application and fast curing ■ Excellent chemical resistance and corrosion protection ■ High abrasion resistance and weather resistance ■ Flexibility and crack-following ability *For more details, please download the PDF or feel free to contact us.

  • Store construction
  • Plastering and painting work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temporary construction technology

We will respond to a wide variety of construction needs with diverse methods!

We provide technical proposals for various construction methods and temporary methods associated with construction. We respond to a wide range of construction needs with diverse methods, including Down-the-Hole Hammer Method, various types of Vibratory Hammer Methods, and Press-in Methods. Please feel free to contact us with your requests. 【List of Methods】 ■ HS Super U Method ■ Down-the-Hole Method ■ Steel Sheet Pile Driving Method (various types) ■ Installation of Retaining Steel Materials ■ Gondola Method, etc. *For more details, please feel free to contact us.

  • Ground foundation construction method
  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration